工业工程2017,Vol.20Issue(4):37-48,12.DOI:10.3969/j.issn.1007-7375.e17-2023
工业园区中ATO订单拉动的"生产-物流"联动优化方法
Production Logistics Synchronization Optimization Through ATO Pulling in Industrial Park
摘要
Abstract
To address problems induced by the assembly to order (ATO) production in industrial park, e.g. production logistics information synchronization and high operation cost, the "three-stage two-degree" production logistics synchronization (PLS) control mechanism was proposed based on Internet of Thing. Using simulation analysis of the cooperative optimization algorithm, it showed that 1) the earlier is the order dynamic, the more obvious is the benefit of synchronization control; 2) that the synchronization control across enterprises in industrial park can effectively help reduce logistics costs; and 3) that the later the dynamic happens and the bigger is the demand order, the more difficult the synchronization control will be, but its economic benefits will be better relative to un-synchronization.关键词
生产物流/联动控制/协同优化Key words
production logistics/synchronization control/collaborative optimization(CO)分类
信息技术与安全科学引用本文复制引用
吴强,屈挺,颜志军,张婷,黄国全..工业园区中ATO订单拉动的"生产-物流"联动优化方法[J].工业工程,2017,20(4):37-48,12.基金项目
国家自然科学基金资助项目(51475095) (51475095)
广州市科学(技术)研究专项一般项目资助(201607010154) (技术)