煤矿安全2017,Vol.48Issue(8):116-120,5.DOI:10.13347/j.cnki.mkaq.2017.08.033
综采工作面极近距离跨空巷回采技术
Extreme Distance Crossing Abandoned Roadway Mining Technology of Fully Mechanized Mining Face
摘要
Abstract
To guarantee the safety mining of 18201 working face,numerical simulation is used to analyze the support parameters of wooden stamp support.Through the formula,the depth of coal seam floor damage and the floor stability of working face during mining period is calculated,which guarantees the safety mining of work face in theory.The mine pressure monitoring results show that the damage of surrounding rock does not appear and the support parameters of wooden stamp are reasonable in the caving mining face passing through the abandoned gateway.关键词
木跺支护/底板稳定性/跨空巷开采/数值模拟/矿山压力监测Key words
wooden stamp supporting/floor stability/crossing abandoned roadway mining/numerical simulation/mine ground pressure monitoring分类
矿业与冶金引用本文复制引用
王宪勇..综采工作面极近距离跨空巷回采技术[J].煤矿安全,2017,48(8):116-120,5.基金项目
国家自然科学基金资助项目(51304118) (51304118)