| 注册
首页|期刊导航|交通信息与安全|基于M/M/C排队模型的三峡大坝船舶待闸时长预测研究

基于M/M/C排队模型的三峡大坝船舶待闸时长预测研究

钟鸣 李晨辉 刘少博

交通信息与安全2017,Vol.35Issue(4):84-91,8.
交通信息与安全2017,Vol.35Issue(4):84-91,8.DOI:10.3963/j.issn.1674-4861.2017.04.011

基于M/M/C排队模型的三峡大坝船舶待闸时长预测研究

A Study on Prediction of Waiting Time of Ships Crossing Three Gorges Locks based on M/M/C Queuing Models

钟鸣 1李晨辉 2刘少博3

作者信息

  • 1. 武汉理工大学智能交通系统研究中心 武汉 430063
  • 2. 武汉理工大学国家水运安全工程技术研究中心 武汉 430063
  • 3. 武汉理工大学水路公路交通安全控制与装备教育部工程研究中心 武汉 430063
  • 折叠

摘要

Abstract

In order to study the issue of serious delay of ships during the process of crossing Three Gorges Locks, downstream traffic flow consisting of different types of ships arriving at anchorages and passing Locks in 2013 is collected and analyzed.Frequency distribution of different waiting durations of ships are also summarized and presented.Queuing theory is used to conceptualize the anchorages of Three Gorges Dam as a queuing system with random arrival rate and multiple servers, M/M/C queuing model is used to best represent the system and used to model average waiting time and average queuing length, etc.of the system.The observed arrival rate of ships and service rate of anchorages in 2013 are used as inputs of the model, average delay time estimated from the model is compared with the actual data, and the absolute percent error (APE) is found to be 7.3%, which suggests that the accuracy of the model is acceptable.Then sensitivity analysis of the model is carried out by specifying different arrival rates and service rates.Study results show that decreasing arrival rate by 15% (e.g.the goods from 15% of all of the ships arrived will be transfer to road transportation) would change the status of the anchorages from overloading to operating within the capacity.On the other hand, if increasing arrival rate by 15%, then the system will be unstable and fully congested.However, if, at the same time, the service rate of the anchorages increases by 30%, the system will return to its stable status and the parking demand of arriving vessels can be accommodated.

关键词

内河航运/排队论/三峡大坝/待闸时间

Key words

inland waterway transport/queuing theory/Three Gorges Locks/waiting time of ships

分类

交通工程

引用本文复制引用

钟鸣,李晨辉,刘少博..基于M/M/C排队模型的三峡大坝船舶待闸时长预测研究[J].交通信息与安全,2017,35(4):84-91,8.

基金项目

武汉理工大学校中央高校基本科研业务费专项资金(2014-VII-036)、湖北省自然科学基金项目(2015CFB599)资助 (2014-VII-036)

交通信息与安全

OA北大核心CSCDCSTPCD

1674-4861

访问量0
|
下载量0
段落导航相关论文