| 注册
首页|期刊导航|可再生能源|考虑不完全维修的风电机组预防性机会维修策略

考虑不完全维修的风电机组预防性机会维修策略

郑小霞 李佳 贾文慧

可再生能源2017,Vol.35Issue(8):1208-1214,7.
可再生能源2017,Vol.35Issue(8):1208-1214,7.

考虑不完全维修的风电机组预防性机会维修策略

Preventive opportunistic maintenance strategy of wind turbines considering imperfect maintenance

郑小霞 1李佳 1贾文慧1

作者信息

  • 1. 上海电力学院 自动化工程学院,上海 200090
  • 折叠

摘要

Abstract

Aiming at the problems of single and costly maintenance of wind turbine,a preventive opportunistic maintenance strategy of wind turbines considering imperfect maintenance is proposed. Firstly,Weibull distribution is used to model the reliability of wind turbine,the reliability of imperfect maintenance was determined according to the preventive maintenance reliability and the opportunity maintenance reliability,two maintenance methods of imperfect repair and opportunity replace was taken aiming at the key components which are in the range of opportunity maintenance;The imperfect maintenance method was modeled by decreasing age factor and failure rate increasing factor,and then the maintenance plan was determined; Then the maintenance cost model of wind turbine is established,to the lowest cost target, the imperfect maintenance reliability is optimized by cubic spline interpolation. Finally,simulations are carried out with the specific case of wind turbines maintenance,the results show the strategy can improve the coordination of component maintenance and reduce the maintenance cost,which verifies the effectiveness of the proposed strategy.

关键词

风电机组/机会维修/可靠度/不完全维修/维修成本

Key words

wind turbines/opportunistic maintenance/reliability/imperfect maintenance/maintenance cost

分类

能源科技

引用本文复制引用

郑小霞,李佳,贾文慧..考虑不完全维修的风电机组预防性机会维修策略[J].可再生能源,2017,35(8):1208-1214,7.

基金项目

国家自然科学基金资助项目(51507098) (51507098)

上海市电站自动化技术重点实验室项目(13DZ2273800). (13DZ2273800)

可再生能源

OA北大核心CSTPCD

1671-5292

访问量0
|
下载量0
段落导航相关论文