| 注册
首页|期刊导航|南方电网技术|采用常规直流配置动态无功补偿或柔性直流对受端广东电网稳定性影响的对比分析

采用常规直流配置动态无功补偿或柔性直流对受端广东电网稳定性影响的对比分析

姚文峰 洪潮 周保荣 黄东启 赵文猛 聂金峰

南方电网技术2017,Vol.11Issue(7):45-50,6.
南方电网技术2017,Vol.11Issue(7):45-50,6.DOI:10.13648/j.cnki.issn1674-0629.2017.07.008

采用常规直流配置动态无功补偿或柔性直流对受端广东电网稳定性影响的对比分析

Comparison on Influence of LCC-HVDC+Dynamic Reactive Power Compensation or VSC-HVDC at Inverter Side on Stability of Guangdong Power Grid

姚文峰 1洪潮 1周保荣 1黄东启 1赵文猛 1聂金峰1

作者信息

  • 1. 直流输电技术国家重点实验室(南方电网科学研究院), 广州510663
  • 折叠

摘要

Abstract

Aiming at Wudongde multi-terminal UHVDC project, this paper studies the influence of line commutated converter HVDC ( LCC-HVDC) configured with dynamic reactive power compensation scheme or voltage source converter HVDC ( VSC-HVDC ) scheme on the stability of inverter side of Guangdong Power Grid.Firstly, STATCOM is selected as the dynamic reactive power com-pensation devices after comparing technical performance, voltage stability and real performance.Secondly, the stability of receiving-end grid is analyzed when LCC, LCC+dynamic reactive power compensation devices and VSC are used seperately when the receiving-end is at eastern Guangdong and at western Guangdong.Research results show that STATCOM should be put into operation in different levels for LCC scheme if the N-1 constraints are satisfied and the ability of withstanding severe AC system faults increases to the level of VSC scheme.

关键词

乌东德特高压多端直流/柔性直流/常规直流/广东电网/稳定性分析

Key words

Wudongde multi-terminal UHVDC/VSC-HVDC/LCC-HVDC/Guangdong Power Grid/stability analysis

分类

信息技术与安全科学

引用本文复制引用

姚文峰,洪潮,周保荣,黄东启,赵文猛,聂金峰..采用常规直流配置动态无功补偿或柔性直流对受端广东电网稳定性影响的对比分析[J].南方电网技术,2017,11(7):45-50,6.

基金项目

国家重点研发计划资助项目 (2016YFB0901001).Supported by the National Key Research and Develop-ment Program of China (2016YFB0901001). (2016YFB0901001)

南方电网技术

OA北大核心CSTPCD

1674-0629

访问量0
|
下载量0
段落导航相关论文