| 注册
首页|期刊导航|水力发电|模糊综合评判法在混凝土坝施工质量控制评价中的应用

模糊综合评判法在混凝土坝施工质量控制评价中的应用

陈兰 王一峰 刘晓路 沈盛彧

水力发电2017,Vol.43Issue(9):53-57,5.
水力发电2017,Vol.43Issue(9):53-57,5.

模糊综合评判法在混凝土坝施工质量控制评价中的应用

Application of Fuzzy Comprehensive Evaluation Model in the Evaluation of Construction Quality Control of Concrete Dams

陈兰 1王一峰 1刘晓路 1沈盛彧1

作者信息

  • 1. 长江水利委员会长江科学院,湖北武汉430010
  • 折叠

摘要

Abstract

By considering the influences of concrete raw material,mix ratio,blending,transportation and placing process on construction quality control of concrete dam,the building process of fuzzy comprehensive evaluation model is analyzed,and a two-grade fuzzy comprehensive evaluation model is established for a concrete dam to objectively and scientifically evaluate the construction quality control.The application analysis shows that the model can better evaluate the construction quality control effect of concrete dam.

关键词

模糊综合评判法/混凝土坝/施工质量控制/综合评价

Key words

fuzzy comprehensive evaluation method/concrete dam/construction quality control/comprehensive evaluation

分类

建筑与水利

引用本文复制引用

陈兰,王一峰,刘晓路,沈盛彧..模糊综合评判法在混凝土坝施工质量控制评价中的应用[J].水力发电,2017,43(9):53-57,5.

基金项目

国家自然科学基金资助项目(41601298) (41601298)

水力发电

OA北大核心CSTPCD

0559-9342

访问量0
|
下载量0
段落导航相关论文