铁道标准设计2017,Vol.61Issue(9):5-8,4.DOI:10.13238/j.issn.1004-2954.2017.09.002
杭州至绍兴城际铁路工程起点位置选择与衔接方案研究
Research on Departure Station Selection and Transfer Scheme of Hangzhou-Shaoxing Intercity Railway Project
陈亮1
作者信息
- 1. 中国铁路设计集团有限公司,天津300251
- 折叠
摘要
Abstract
Hangzhou-Shaoxing Intercity Railway Project is an important part of Hangzhou Urban Economic Circle Rail Network listed in the Zhejiang Province Railway Network Planning (2011 ~2030).The project connects Hangzhou Rail Transit Network and Shaoxing Rail Transit Network.In compliance with rail transit planning of the two cities and following the guidance of overall planning,detailed study on the location of the departure station is conducted based on the principle of people-oriented.The reasonable transfer between the two cities' urban rail transit networks and reasonable transfer of the intercity railway is to be fulfilled to void investment waste caused by repeated construction.This paper puts forward initial prospective and design ideas of Hangzhou-Shaoxing intercity departure station location and transfer scheme:(1) XiangzhangRoad Station is recommend the departure station;(2) laminated transfer island scheme is suggested between Intercity Railways and Metro Line No.5;(3) research on the departure station and transfer scheme of Hangzhou-Shaoxing Intercity Railway should be carried out based on people-oriented principle to shorten transfer distance and time in consideration of the urban rail transit network and the feasibility of the overall planning.关键词
城际铁路/起点/衔接方案/城市轨道交通网/设计Key words
Intercity railway/Departure station/Transfer scheme/Urban rail transit network/Design分类
交通工程引用本文复制引用
陈亮..杭州至绍兴城际铁路工程起点位置选择与衔接方案研究[J].铁道标准设计,2017,61(9):5-8,4.