| 注册
首页|期刊导航|铁道标准设计|CTCS-2+ATO系统技术现状与发展展望

CTCS-2+ATO系统技术现状与发展展望

沈志凌

铁道标准设计2017,Vol.61Issue(9):132-137,6.
铁道标准设计2017,Vol.61Issue(9):132-137,6.DOI:10.13238/j.issn.1004-2954.2017.09.028

CTCS-2+ATO系统技术现状与发展展望

Current Status and Development Prospect of CTCS-2+ATO Train Control System

沈志凌1

作者信息

  • 1. 中铁第四勘察设计院集团有限公司,武汉430063
  • 折叠

摘要

Abstract

This article introduces the origination of the CTCS-2+ATO system,system requirements for CTCS-2+ATO train control system applied in the Pearl River intercity railways,and associated functions and major technical specifications.After the comparison of various train-land communication methods,measures are suggested to improve train stop precision in the station.Configuration principles of newly installed CCS equipment dedicated to CTCS-2+ATO and schemes for associated equipment TCC,CTC and interlock are investigated.This article also analyzes market applications and defines technical details for further improvement,including the diversification of train-land communication,efficiency of automatic reversal,reduction of track length,redundant configuration of LKJ,ZPW-2000 track circuit and the interface with platform entrance.

关键词

CTCS-2/ATO/信号系统/列控/展望

Key words

CTCS-2/ATO/Signaling System/Train Control System/Expectation

分类

交通工程

引用本文复制引用

沈志凌..CTCS-2+ATO系统技术现状与发展展望[J].铁道标准设计,2017,61(9):132-137,6.

铁道标准设计

OA北大核心

1004-2954

访问量0
|
下载量0
段落导航相关论文