交通运输工程与信息学报2017,Vol.15Issue(3):35-40,6.DOI:10.3969/j.issn.1672-4747.2017.03.005
重庆渝利线市郊列车通勤化开行方案
Suburban Train Commuting Operation Plan in Chongqing-Lichuan Railway
摘要
Abstract
Due to the assembly characteristics in Chongqing's railway system, the suburban rail operations based on the existing railway infrastructure can effectively alleviate the traffic pressure in the main urban areas of Chongqing. The current situations of suburban trains in Chongqing-Lichuan railway are analyzed from three aspects, i.e., train quantities, operation times and stopping scenarios. As a result, a new full-time passenger flow model between stations and terminals is proposed to optimize the number of operational sections and suburban train trips. The original train operation plan is improved by considering the real-time demands of suburban passenger flow along the Yu-Li corridor. In the improved schedule, 3.5 pairs of train trips on the Chongqingbei-Fulingbei section and 7 pairs of train trips on the Chongqingbei-Shizhuxian section can be added to meet the realistic demands of suburban passenger flow during the period from 6:00 to 21:30, and to increase the operation frequency of the suburban trains in the morning and evening peak times. In comparison to the original plan, the improved plan can provide better service for the railway commuters.关键词
渝利线/市郊列车/通勤/开行方案/客流分析Key words
Chongqing-Lichuan corridor/suburban trains/commuting/operation plan/passenger flow analysis分类
交通工程引用本文复制引用
薛锋,周焱,赵蕾..重庆渝利线市郊列车通勤化开行方案[J].交通运输工程与信息学报,2017,15(3):35-40,6.基金项目
四川省教育厅自然科学项目(15ZB0477) (15ZB0477)
中央高校基本科研业务费专项资金资助(2682013CX068). (2682013CX068)