太原理工大学学报2017,Vol.48Issue(5):772-777,6.DOI:10.16355/j.cnki.issn1007-9432tyut.2017.05.012
大直径盾构隧道施工对高层建筑及桩基影响数值分析
Numerical Analysis on Pile Foundations′Settlement in Large Diameter Shield Tunnel Construction
摘要
Abstract
According to the construction conditions of a large diameter shield tunnel under construction in soft ground adj acent pile foundation of high-rise building,a three-dimensional nu-merical model was established and compared with field data to verify the rationality of the model. The paper also discussed the effects of different crossing forms of shield construction on high-rise building settlement and pile deformation for large diameter shield through the pile foundation of high-rise building,thus to provide reference for construction control.关键词
大直径盾构隧道/桩基/高层建筑/沉降/数值模拟Key words
large diameter shield tunnel/pile foundation/high building/settlement/numeri-cal analysis分类
交通工程引用本文复制引用
杨记芳..大直径盾构隧道施工对高层建筑及桩基影响数值分析[J].太原理工大学学报,2017,48(5):772-777,6.基金项目
山西省交通科技基金资助项目(2015-1-18) (2015-1-18)