三角高程法在跨河水准测量中的主要误差及控制措施

何宗友 胡海驹 朱紫阳 钟焕良

华南地震2017,Vol.37Issue(1):68-72,5.
华南地震2017,Vol.37Issue(1):68-72,5.DOI:10.13512/j.hndz.2017.01.011

三角高程法在跨河水准测量中的主要误差及控制措施

Main Error and Control Measures of Cross-River Trigonometric Leveling

何宗友 1胡海驹 1朱紫阳 1钟焕良1

作者信息

  • 1. 广东省国土资源测绘院,广州510500
  • 折叠

摘要

Abstract

Taking the Pearl River Delta regional datum frame cross river leveling measurement for example,the paper analyzed the principle and error sources of the trigonometric leveling scheme,and putted forward the method eliminating the high error of instrument by combining with the total station and the level of nearly horizontal line of sight readings measure instrument.The paper focused on the analysis of the impact of the error on the measurement and control measures.The results show that reasonable selection of river crossing point,line of sight control vertical angle,the length of sight,symmetry and other means of observation,can weaken the influence of atmospheric refraction error,earth curvature error,measure to increase the number of accuracy can be improved by using high precision electronic tachometer.

关键词

跨河水准/三角高程测量/误差/全站仪

Key words

Cross-river leveling/Trigonometric leveling/Error/Electronic Total Station

分类

交通工程

引用本文复制引用

何宗友,胡海驹,朱紫阳,钟焕良..三角高程法在跨河水准测量中的主要误差及控制措施[J].华南地震,2017,37(1):68-72,5.