The scheduling problem of ship curved block has complex process and characteristic of spatio -temporal coupling,the lack of standard process and efficient method in formulating scheduling plan is bottleneck problem in shipbuilding.Proposed a scheduling method based on spatio-temporal constraint ,it first build mathematical model contains spatio-temporal constraint ,then use rules and decomposed strategy to design a reasonable and simple heuristic algorithm ,finally,some curved blocks were simula-ted as example to validate the scheduling method.The result shows that the scheduling method which proposed performs well and can bring dramatic increase in block production efficiency and utility rate of work space.关键词
船舶建造/曲面分段/调度算法/时空约束Key words
ship building/curved block/scheduling algorithm/spatio-temporal constraint分类
信息技术与安全科学引用本文复制引用
王梦莹,景旭文,周宏根,李磊,陈旭东,尚正阳..基于时空约束的船体曲面分段车间调度方法研究[J].现代制造工程,2017,(9):96-101,6.基金项目
国防基础科研项目(JCKY2013414C001,JCKY2013206C004) (JCKY2013414C001,JCKY2013206C004)