中国电力2017,Vol.50Issue(10):52-56,5.DOI:10.11930/j.issn.1004-9649.20160209
特高压变电工程设计与施工衔接安全防护措施研究
Research on Safety Protective Measures for Effective Connection Between Design and Construction in UHV Substation Proiects
摘要
Abstract
At present,UHV projects have already entered large-scale construction stage.UHV substation projects have difficult construction process and high security risks.In order to ensure construction personnel and equipment safety,it is necessary to fully consider feasibility and safety of construction process in engineering project design stage.Two typical kinds of forced regulation violation,caused by disconnection in safety between design and construction stage,are discussed in detail.The two violation cases are "misuse safety ropes in heighted work" and "rule violation of fixing cable wind ropes and traction cable".Targeted safety protection measures,which consider conditions in engineering design stage for the implementation of relevant safety management rules in construction process,are put forward.Proposed safety protection measures have already been applied in Huainan-Nanjing-Shanghai UHV transmission and transformation project with anticipated effect.关键词
特高压变电工程/安全防护/受追性违章/施工设计/防护措施Key words
UHV substation project/safety protection/forced illegal behavior/construction design/protective measures分类
信息技术与安全科学引用本文复制引用
熊织明,刘建楠,倪向萍,戴挈军,李盈盈,王小松,张达..特高压变电工程设计与施工衔接安全防护措施研究[J].中国电力,2017,50(10):52-56,5.基金项目
国家电网公司科技项目(SHJJGC1500137)This work is supported by the Science and Technology Project of SGCC (No.SHJJGC1500137). (SHJJGC1500137)