| 注册
首页|期刊导航|水土保持学报|人工红壤坡面对超大雨强降雨的响应过程

人工红壤坡面对超大雨强降雨的响应过程

金鑫 谢斯琴 宋颖 王春振 赵华荣 李世东 汪蓬

水土保持学报2017,Vol.31Issue(5):19-24,6.
水土保持学报2017,Vol.31Issue(5):19-24,6.DOI:10.13870/j.cnki.stbcxb.2017.05.004

人工红壤坡面对超大雨强降雨的响应过程

Experimental Study on the Response of Artificial Red Soil Slope to the Large Rainfall Intensity

金鑫 1谢斯琴 2宋颖 1王春振 2赵华荣 1李世东 1汪蓬1

作者信息

  • 1. 桂林理工大学,广西环境污染控制理论与技术重点实验室,广西桂林541004
  • 2. 桂林理工大学,岩溶地区水污染控制与用水安全保障协同创新中心,广西桂林541004
  • 折叠

摘要

Abstract

By using artificial rainfall simulation system and variable slope soil trough,the runoff and sediment yield responses of red soil slope under heavy rainfall were tested to study the response of artificial red soil slope to heavy rainfall.The rainfall intensities included 140,160,and 190 mm/h,and the slope degrees included 10 °,15 °,20 ° and 25 °.The experimental results showed that the erosion modulus in red soil slope with simple artificial treatment under super rain intensity of 140 ~ 190 mm/h was significantly lower than that in slopes without treatment under rain intensity of 50~120 mm/h,and the rill development process was slow.This indicated that soil treatment on slope could effectively improve the soil erosion resistance.Under the same rainfall intensity,the runoff yield time firstly delayed and then shortened with the increasing of slope degree,and the critical gradient of the runoff yield was between 20°and 25°.Under the same rainfall intensity,the erosion modulus firstly increased and then decreased with the increasing of slope degree,and the critical gradient was different under different rainfall intensity.The erosion critical gradient was 15°~ 20° when the rainfall intensity was 140 mm/h,and it was 20°~25° when the rainfall intensity was 160 mm/h and 190 mm/h.Overall,the erosion process was affected by the rainfall intensity more than the slope degree.The erosion processes of slopes with different slope degrees were relatively stable when the rainfall intensity was 140 mm/h,and the development of rill was weak.The erosion was strengthened when the rainfall was 160 mm/h,but there was not obvious tend in the erosion process.When the rainfall intensity was 190 mm/ h,the erosion mainly occurred in the first 30 min of the rainfall,and the development of rill was relatively severe,and it tends to be stable after 30 min.

关键词

超大雨强/人工红壤坡面/侵蚀过程/临界坡度

Key words

large rainfall intensity/artificial red soil slope/erosion process/critical gradient

分类

农业科技

引用本文复制引用

金鑫,谢斯琴,宋颖,王春振,赵华荣,李世东,汪蓬..人工红壤坡面对超大雨强降雨的响应过程[J].水土保持学报,2017,31(5):19-24,6.

基金项目

国家自然科学基金项目(51369009) (51369009)

广西自然科学基金项目(2016GXNSFAA380116) (2016GXNSFAA380116)

广西矿冶与环境科学实验中心,广西高等学校高水平创新团队及卓越学者计划项目(002401013001) (002401013001)

水土保持学报

OA北大核心CSCDCSTPCD

1009-2242

访问量0
|
下载量0
段落导航相关论文