浅埋PVC管道穿越挖填方场地时受力状态研究
The study of positive buried pipeline's strained condition crossing the transition zone of high embankment
摘要
Abstract
This paper took the PVC drainage pipeline in Yan'an District of loess gully high embankment engineering as the test's prototype. By making a 1:2 physical model test, the combination of filling and excavation site of shallow buried PVC pipes in the post construction settlement was simulated during the stress and the deformation process. The deformation of pipeline, pipe soil contact pressure and strain data were obtained. Studies show that when the deep ground subsidence quantity is greater than 6 mm, pipe in various parts of the stress state of differentiation and pipeline interface for the adverse effects at this stage starts to appear. The pipeline interface is not recommended layout in cut fill transition zone and the middle of high fill.关键词
黄土高填方/工后沉降/直埋管道/受力分析/管道接口/模型试验Key words
loess high embankment/post construction settlement/buried pipe/force analysis/pipeline interface/model test分类
建筑与水利引用本文复制引用
段旭,董琪,门玉明..浅埋PVC管道穿越挖填方场地时受力状态研究[J].铁道科学与工程学报,2017,14(10):2177-2184,8.基金项目
陕西省重点科技创新团队计划项目(2016KCT-13) (2016KCT-13)
陕西省重点产业创新链"社会发展领域"资助项目(2015KTZDSF03-02) (2015KTZDSF03-02)
陕西省社会发展科技攻关项目(2016SF-455) (2016SF-455)