引松供水工程总干线地应力测试研究

赵宪女 焦景辉

水力发电2017,Vol.43Issue(10):36-40,5.
水力发电2017,Vol.43Issue(10):36-40,5.

引松供水工程总干线地应力测试研究

Study on Ground Stress Test of Main Diversion Line of Water Supply Project from Songhua River

赵宪女 1焦景辉2

作者信息

  • 1. 长春工程学院机电工程学院,吉林长春130012
  • 2. 吉林省水利水电勘测设计研究院,吉林长春130021
  • 折叠

摘要

Abstract

The Project of Water Supply from Songhua Lake is the largest water conservancy project in Jilin province.The total length of main diversion tunnel is about 98 km,which is one of the longest pressurized diversion tunnels in China.The tunnel will pass through different lithology layers,so the geological conditions are complex.By using hydrodynamic fracturing method,the ground stress test is carried out to study the characteristics of ground stress field of tunnel,and the maximum and minimum horizontal principal stresses and the direction of horizontal principal stress are obtained.The results show that the ground stress in test area is medium-low level.From the point of view of ground stress,the choice of tunnel axis is more favorable to the stability of surrounding rock.

关键词

地应力/测试/水压致裂法/引松供水工程

Key words

ground stress/test/method of hydraulic fracturing/Water Supply Project from Songhua Lake

分类

建筑与水利

引用本文复制引用

赵宪女,焦景辉..引松供水工程总干线地应力测试研究[J].水力发电,2017,43(10):36-40,5.

基金项目

国家自然科学基金项目(51378075,51678065) (51378075,51678065)

吉林省科学技术厅重点科技攻关项目(20160204020SF) (20160204020SF)