The offshore booster station is the key link of power transmission in offshore wind farm.All the equipments of its upper block are assembled in the base.In base hoisting,water transport and sea hoisting,the inclination and vibration may cause some impacts on electrical equipments of offshore booster station,or even damage.Based on the construction monitoring of upper block in coastal offshore booster station in Jiangsu Province,the variation law of inclination and vibration are studied.The monitoring results show that the inclination and vibration during construction period is small,which meet design requirements.The monitoring provides relevant measurement parameters for the design and construction of offshore booster station.

关键词

海上升压站/上部组块/施工期监测/倾斜/振动

Key words

offshore boost station/upper block/construction monitoring/inclination/vibration

分类

信息技术与安全科学

引用本文复制引用

郭伟,程莲莲..海上升压站上部组块施工期监测与分析[J].水力发电,2017,43(10):103-106,4.

水力发电

OA北大核心CSTPCD

0559-9342

访问量0
|
下载量0
段落导航相关论文