土木工程与管理学报2017,Vol.34Issue(5):46-51,6.
基于OWA-ER的城市轨道交通PPP项目风险评估
Risk Assessment of the Urban Rail Transit PPP Projects Based on OWA-ER
王建波 1彭龙镖 1李娜 1张帅1
作者信息
- 1. 青岛理工大学 管理学院,山东 青岛 266520
- 折叠
摘要
Abstract
Public-Private-Partnership has great advantages in solving the problems of lacking infrastructure funding and operations management efficiency. But projects always fail because of indifference to risk assessment. A urban rail transit PPP project risk assessment model based on OWA-ER is established against to the gray and fuzzy features of urban rail transit PPP project risks. It uses OWA operator's ordering weighted technology to solve the problem of excessive empowerment deviation,and proposes using two-dimensional semantic to descript the accuracy of fuzzy reviews. Finally,it can avoid the impact of information redundancy and loss to evaluation result with ER integrating the evaluation information. The feasibility and scientificity of this evaluation method are verified by Qingdao Metro Line 1 PPP project risk assessment. It has a certain significance to similar project's risk assessment.关键词
城市轨道交通PPP项目/风险评估/OWA/证据推理/两维语义Key words
urban rail transit PPP project/risk assessment/OWA/ER/two-dimensional semanteme分类
管理科学引用本文复制引用
王建波,彭龙镖,李娜,张帅..基于OWA-ER的城市轨道交通PPP项目风险评估[J].土木工程与管理学报,2017,34(5):46-51,6.