基于Z-number理论的关键链缓冲计算方法
Critical Chain Buffering Calculation Method Based on Z-number Theory
摘要
Abstract
To identify critical chain buffering time rationally,through the introduction of Z-number theory,the paper put forward a buffering calculation model which comprehensively considered the process risk,project risk and resource risk. Among them,the Z-number theory is used to demonstrate the uncertainty of process duration. The reliability of process duration estimated value determine process risk,and the overall level of the project resource tension indicates the project risk. The results show that the proposed model can reduce the negative impact risk factors exerting on project. Setup buffering time not only can protect project implementation effectively but also can avoid buffering waste. Finally,the result confirmed the superiority and practicability of proposed model with comparison of existing fuzzy buffer model from theory and data point of view.关键词
工程项目/关键链/缓冲计算模型/Z-number理论Key words
project item/critical chain/buffering calculation model/Z-number theory分类
建筑与水利引用本文复制引用
赵程伟,董雄报,洪青..基于Z-number理论的关键链缓冲计算方法[J].土木工程与管理学报,2017,34(5):159-164,6.基金项目
广西社科规划项目(PS13006A) (PS13006A)