考虑弃风限制的电网鲁棒安全经济调度
Robust Security Economic Dispatch Considering Wind Power Curtailment
摘要
Abstract
Accessed with large scale wind power, the wind power absorption ability of power grid are restricted by reserve capacity and line transmission power. This paper proposed that setting an optimal wind power curtailment for making safety wind power output interval, in order to ensure that the reserve capacity is sufficient and the line transmission power is under limitation. In the aspect of arithmetic, this paper turned the BLP problem to a MILP problem so as to achieve the overall solution. Tested by improved IEEE 14 bus system, this method analyzed the influence on initial wind power output interval caused by reserve capacity and line transmission power respectively. Finally, a feasible safety wind power output interval could be achieved. The optimal results showed that the method was effective and feasible.关键词
弃风限制/备用容量/线路传输功率/风电出力区间/双线性规划Key words
wind power curtailment/reserve capacity/line transmission power/wind power output interval/BLP分类
信息技术与安全科学引用本文复制引用
符杨,陈铤,李振坤,魏书荣,季亮..考虑弃风限制的电网鲁棒安全经济调度[J].中国电机工程学报,2017,37(z1):47-54,8.基金项目
国家重点研发计划(2017YFB0902803).National Key R&D Program of China (2017YFB0902803). (2017YFB0902803)