电力系统及其自动化学报2017,Vol.29Issue(10):123-129,7.DOI:10.3969/j.issn.1003-8930.2017.10.021
基于能源集线器模型的园区混合能源系统日前优化调度方法
Optimal Day-ahead Scheduling Method for Hybrid Energy Park Based on Energy Hub Model
摘要
Abstract
A typical hybrid energy park(HEP)is composed of distributed generations(DGs)and combined cooling, heating and power(CCHP)system on the demand side,and it can realize input energies( e.g.,electric power,photo?voltaic power,natural gas)and output energies(e.g.,electric power,heat and cooling),thus significantly improving the energy utilization efficiency and reducing the cost of consumers. In this paper,with an HEP composed of electric power and natural gas as research object ,multi-energy resources are processed by optimal day-ahead scheduling (ODS)method to reduce the energy cost of HEP. First,an HEP model is established. Then,an ODS method is given based on energy hubs. At last,the effectiveness of the proposed method is verified by a typical HEP.关键词
混合能源系统/分布式发电/冷热电联供系统/日前优化调度Key words
hybrid energy park (HEP)/distributed generation (DG)/combined cooling/heating and power (CCHP)/optimal day-ahead scheduling(ODS)分类
信息技术与安全科学引用本文复制引用
卜凡鹏,田世明,方芳,尹凯,杜伟强..基于能源集线器模型的园区混合能源系统日前优化调度方法[J].电力系统及其自动化学报,2017,29(10):123-129,7.基金项目
国家重点研发计划资助项目(2016YFB0901102) (2016YFB0901102)
国家电网公司科技项目《面向随机性电源的多元负荷主动响应及预测控制技术研究与应用》 ()