华东交通大学学报2017,Vol.34Issue(5):12-20,9.
桩板及空心板梁桥结构下穿软土区高铁桥梁的数值模拟研究
Numerical Simulation of Pile-plank Structure and Hollow Board Beam Bridge Structure Traversing Construction under High-speed Railway Bridge
杨菲1
作者信息
- 1. 山西省交通科学研究院,山西 太原 030006
- 折叠
摘要
Abstract
The traversing construction under high-speed railway bridge can cause excessive displacement for high-speed railway bridge piers, which may affect the safety of railway. Aiming at the impact of traversing con-struction under high-speed railway bridge, taking Danyang Downtown-Riverside New City Expressway traversing under the Beijing-Shanghai high-speed railway Zhangxiang Bridge as the object, this study conducted a three-dimensional construction simulation with Plaxis geotechnical engineering finite element software. The calculation results were input into the fine-grained model of the ballastless track on the high-speed railway bridge estab-lished by ABAQUS finite element software to evaluate the influence of the pile-plank structure and hollow board beam bridge traversing construction on high-speed railway bridge. Relevant calculation results show that the in-fluence of the pile-plank structure and hollow board beam bridge on high-speed railway meets the requirements of structural protection and operation safety.关键词
道路/市政工程/下穿施工/高铁桥梁/数值分析Key words
expressway/municipal engineering/traversing construction/high-speed railway bridge/numerical analysis分类
交通工程引用本文复制引用
杨菲..桩板及空心板梁桥结构下穿软土区高铁桥梁的数值模拟研究[J].华东交通大学学报,2017,34(5):12-20,9.