摘要

Abstract

In order to solve the engineering problems of secondary hydraulic jump and downstream river bed erosion due to insufficient energy dissipation in deep tailwater stilling basin, this paper compares the stilling basin flow fields of flat gate pier, conventional flaring gate pier and incomplete flaring gate pier based on the physical and numerical models. Results show that through increasing velocity gradient and lateral water level gap between adjacent chambers, the incomplete flaring gate pier can promote the lateral diffusion and collision of water jets to form growing vertical vor-tex from bottom to surface in the upper regions of stilling basin. This would significantly intensify energy dissipation to reduce the outgoing velocity, and completely solve the common hydraulic problems in deep tailwater stilling basin.

关键词

宽尾墩/横向扩散/二次水跃/立轴旋滚/深尾水消力池

Key words

flaring gate pier/lateral diffusion/secondary hydraulic jump/vertical axis/deep tailwater stilling basin

分类

建筑与水利

引用本文复制引用

周招,王均星,梁砚,张文传..深尾水消力池非完全宽尾墩消能试验研究[J].水科学进展,2017,28(5):729-737,9.

基金项目

国家自然科学基金资助项目( 51479145) The study is financially supported by the National Natural Science Foundation of China ( No. 51479145) . ( 51479145)

水科学进展

OA北大核心CSCDCSTPCD

1001-6791

访问量0
|
下载量0
段落导航相关论文