| 注册
首页|期刊导航|高电压技术|1000kV特高压交流紧凑型输电线路综合工况下间隔棒抑制效果仿真研究

1000kV特高压交流紧凑型输电线路综合工况下间隔棒抑制效果仿真研究

王黎明 曹露 梅红伟 赵晨龙 高亚云

高电压技术2017,Vol.43Issue(11):3661-3667,7.
高电压技术2017,Vol.43Issue(11):3661-3667,7.DOI:10.13336/j.1003-6520.hve.20171031022

1000kV特高压交流紧凑型输电线路综合工况下间隔棒抑制效果仿真研究

Simulation Research on the Suppression Effect of Spacers on 1000 kV UHV AC Compact Transmission Lines Under Comprehensive Conditions

王黎明 1曹露 1梅红伟 2赵晨龙 1高亚云1

作者信息

  • 1. 清华大学深圳研究生院,深圳518055
  • 2. 国网上海市电力公司浦东供电公司,上海200120
  • 折叠

摘要

Abstract

The air insulation clearance between phases of compact transmission lines is greatly reduced compared to normal transmission line.Therefore,when it encounters external forces,such as ice-shedding and wind,flashover and line collision accident can happen.We studied the conductor suppression effect of traditional inter-phase spacer and new phase-to-earth spacer under the comprehensive conditions of strong wind and C-phase ice-shedding for 1 000 kV UHV AC compact transmission lines.Based on the nonlinear three-degree-freedom (3DOF) simulation model established by Tsinghua University,the time interval between wind and ice-shedding was studied.When the wind blows simultanenously with ice-shedding,it has the worst influence on air clearance between phases.The conductor suppression effect of different spacer configuration schemes is investigated under the combined conditions of strong wind and ice-shedding.The simulation result shows that it has effective control on the air clearance with span under 1 000 m to apply new phase-to-earth spacer with a height of 14 m and a diameter of 75 mm on C-phase,and three inter-phase spacers with a height of 14 m and a diameter of 30 mm on the place of 1/4,1/2 and 3/4 of A-B phases,respectively.For transmission lines of over 1 000 m span,it is suggested to enlarge the air clearance between phases to 18 m and use spacer configuration scheme above-mentioned.In this way,transmission lines can operate safely with span under 1 500 m.During dynamic operation,the tension and pressure of the insulator are within the safety range,and have great margins.In conclusion,for the compact transmission lines under comprehensive conditions of strong wind and ice-shedding,the method of combining large diameter inter-phase spacers with phase-to-earth spacers is recommended for effective air clearance control.For the transmission lines of larger span,it is necessary to combine the method of increasing the distance between phases to ensure safe air clearance between phases.

关键词

1000 kV/紧凑型输电线路/大风/脱冰/相间间隔棒/相地间隔棒

Key words

1000 kV/compact transmission lines/strong wind/ice-shedding/inter-phase spacer/phase-to-earth spacer

引用本文复制引用

王黎明,曹露,梅红伟,赵晨龙,高亚云..1000kV特高压交流紧凑型输电线路综合工况下间隔棒抑制效果仿真研究[J].高电压技术,2017,43(11):3661-3667,7.

基金项目

国家自然科学基金(51377093).Projected supported by National Natural Science Foundation of China(513770937). (51377093)