黑龙江科技大学学报2017,Vol.27Issue(6):587-591,5.DOI:10.3969/j.issn.2095-7262.2017.06.003
深井软岩巷道底臌的数值模拟
Numerical simulation of floor heave of soft rock roadway in deep mine
摘要
Abstract
This paper seeks a solution to the serious floor heave and deformation occurring in-800 level material roadway of 2442 work face in a mine of Long Coal Group Corporation. The study building on roadway engineering geological condition and existing supporting scheme involves developing a method of anchor grouting in roadway floor and analyzing deep soft rock roadway floor heave deformation using numerical FLAC3D . The results show that the novel method could contribute to an obvious reduction in the displacement of floor heave, roof and two-side and range of plastic zone of floor heave, roof and two-side. The field test verifies the validity of the improved supporting scheme-a method capable of a better control of the deformation of the floor heave. The research may provide a reference for soft rock roadway support in deep mines.关键词
软岩巷道/底臌/数值模拟Key words
soft rock roadway/floor heave/numerical simulation分类
矿业与冶金引用本文复制引用
张晓宇,蒋元男,李者..深井软岩巷道底臌的数值模拟[J].黑龙江科技大学学报,2017,27(6):587-591,5.基金项目
黑龙江省教育厅科学技术研究项目(11544043) (11544043)
黑龙江省普通高校采矿工程重点实验室开放课题资助项目(2013-KF03) (2013-KF03)