| 注册
首页|期刊导航|水利水电技术|AHP法在引黄入冀补淀工程移民安置评估中的应用

AHP法在引黄入冀补淀工程移民安置评估中的应用

李俊峰 卜明玉

水利水电技术2017,Vol.48Issue(10):133-135,141,4.
水利水电技术2017,Vol.48Issue(10):133-135,141,4.DOI:10.13928/j.cnki.wrahe.2017.10.024

AHP法在引黄入冀补淀工程移民安置评估中的应用

Application of AHP method to assessment on immigrant resettlement for Yellow River to Baiyangdian Lake Water Transfer Project

李俊峰 1卜明玉1

作者信息

  • 1. 中水北方勘测设计研究有限责任公司,天津300222
  • 折叠

摘要

Abstract

In order to overcome the defect of the conventional method for assessment on immigrant resettlement,the assessment on the immigrant resettlement for the Yellow River to Baiyangdian Lake Water Transfer Project is taken for the study herein.For the assessment,an assessment index system for the immigrant resettlement is established by selecting 12 common indexes from the 4 aspects,i.e.revenue and expenditure,production,residence and population quality in combination with the project characteristics and the previous experiences.During the investigation,the data of these indexes are emphatically collected,and then their weights are calculated and the sequence order of their important degrees is obtained with AHP method during the assessment.Finally,a comparative analysis is made on the fore-and-aft changes of these key indexes.From the aspect of the analysis result,the items of the important indexes reflected by the AHP method are coincided with both the characteristics of the project and the concerns from the immigrant,thus the analysis process is objective.The method can provide a reference for the assessment on immigrant resettlement.

关键词

AHP/引黄入冀补淀工程/移民安置评估/指标权重

Key words

AHP/Yellow River to Baiyangdian Lake Water Transfer Project/assessment on immigrant resettlement/index weight

分类

社会科学

引用本文复制引用

李俊峰,卜明玉..AHP法在引黄入冀补淀工程移民安置评估中的应用[J].水利水电技术,2017,48(10):133-135,141,4.

水利水电技术

OA北大核心CSCDCSTPCD

1000-0860

访问量0
|
下载量0
段落导航相关论文