首页|期刊导航|铸造|7 MW风电底座生产的关键控制技术

7 MW风电底座生产的关键控制技术

陈玉芳 王星 唐光伟

铸造2017,Vol.66Issue(10):1108-1111,4.
铸造2017,Vol.66Issue(10):1108-1111,4.

7 MW风电底座生产的关键控制技术

The Key Control Production Technology of 7MW Main Frame Casting for Wind Power

陈玉芳 1王星 1唐光伟1

作者信息

  • 1. 江苏吉鑫风能科技股份有限公司,江苏江阴 214422
  • 折叠

摘要

Abstract

The characteristics, technical requirements and casting difficulties of 7MW main frame for wind power were summarized. The production key control technology of 7MW main frame for wind power was introduced from the two aspects of casting and melting technology, especially for core support during molding, casting wall thickness control and spheroidizing, inoculation technology during melting and pouring. The production difficulties were solved through these key technologies control and castings meet the quality requirements finally. It can provide some experience for large wind power casting production.

关键词

大型风电铸件/球墨铸铁/铸造工艺/熔炼技术

Key words

large wind casting/ductile iron/casting technology/melting technology

分类

矿业与冶金

引用本文复制引用

陈玉芳,王星,唐光伟..7 MW风电底座生产的关键控制技术[J].铸造,2017,66(10):1108-1111,4.

铸造

OA北大核心CSCDCSTPCD

1001-4977

访问量0
|
下载量0
段落导航相关论文