铁道科学与工程学报2017,Vol.14Issue(11):2377-2383,7.
广东省改进综合单位线法洪峰流量计算方法研究
Research on flow calculation method of improved synthetic unit hydrograph of Guangdong
摘要
Abstract
In order to study the design peak flow calculation method of medium and small basins in Guangdong, improved synthetic unit hydrograph based on Guangdong synthetic unit hydrograph improvement was put forward. It was combined with characteristics of the present triangular unit hydrograph models and simplified analysis results of Guangdong synthetic unit hydrograph by considering the minimum sum-of-squared differences. The improved synthetic unit hydrograph was set up to establish formulas of the rising duration, base period and peak value. The design peak flow was calculated by loading improved synthetic unit hydrograph with the net rainfall list and taking influence line loading principle as lessons. Results show that the improved synthetic unit hydrograph has enough theoretic bases, and its calculation process is easy to master. Cases analysis results prove that, improved synthetic unit hydrograph method is reliable compared with comprehensive unit hydrograph method and rational formula method of Guangdong. It can be applied in the whole province after further verification.关键词
洪峰流量/三角形单位线/综合单位线/中小流域/广东省Key words
peak flow/triangle unit hydrograph/synthetic unit hydrograph/small and medium watersheds/Guangdong分类
交通工程引用本文复制引用
李整,陈代海,刘琼..广东省改进综合单位线法洪峰流量计算方法研究[J].铁道科学与工程学报,2017,14(11):2377-2383,7.基金项目
国家自然科学基金资助项目(51408557) (51408557)
河南省高等学校重点科研资助项目(15A560011) (15A560011)