摘要

Abstract

Digital instrumentation and control system (DICS) has been widely applied to safety/non-safety systems in NPP .As the central nervous system ,its reliability is cru-cial to the operation and maintenances in the process of operation .Based on the struc-tural and control logics of the digital steam generator water level control system (SGWLCS) ,the Boolean logic driven Markov process (BDMP) formalism was recom-mended and applied to the assessment of the system .With the increase of simulation steps ,the cumulative distribution probability (CDP ) of repairable and non-repairable SGWLCS was calculated .The BDMP model was constructed by KB3 ,and the produc-tivity analysis was performed by the Monte Carlo simulation software YAMS . The tendency of the system CDP used to derive the failure probability with the performance period was assessed in quantitative way .Through the sensitivity of each component of the system ,the importance to the whole system of each component can be intuitively achieved .

关键词

数字化蒸汽发生器水位控制系统/可靠性评价/布尔逻辑驱动的马尔科夫过程

Key words

digital steam generator water level control system/reliability assessment/Boolean logic driven Markov process

分类

能源科技

引用本文复制引用

王浩,余嘉炜,周世梁,毛伊静,许桐雨..基于BDMP的核电厂蒸汽发生器水位控制系统可靠性评价[J].原子能科学技术,2017,51(12):2330-2337,8.

基金项目

国家自然科学基金资助项目(71301049 ) (71301049 )

原子能科学技术

OA北大核心CSCDCSTPCD

1000-6931

访问量0
|
下载量0
段落导航相关论文