| 注册
首页|期刊导航|航天器工程|高分三号卫星发射前状态设置的优化

高分三号卫星发射前状态设置的优化

安亮 于忠江 侯锐 王华茂

航天器工程2017,Vol.26Issue(6):143-148,6.
航天器工程2017,Vol.26Issue(6):143-148,6.DOI:10.3969/j.issn.1673-8748.2017.06.023

高分三号卫星发射前状态设置的优化

Pre-launch Status Configuration Optimization for GF-3 Satellite

安亮 1于忠江 1侯锐 1王华茂1

作者信息

  • 1. 北京空间飞行器总体设计部,北京 100094
  • 折叠

摘要

Abstract

This paper sums up the work contents of pre-launch status configuration and monitoring for GF-3 satellite,and also introduces the advantage of automated test tool based on that the work method of pre-launch status configuration is given.An optimization scheme that can reduce time-consuming from five hours to three hours is presented in this paper without sim-plifying pre-launch status configuration process.The scheme is proved through verifying and cal-culating GF-3 satellite test and launched data in satellite launch center.The scheme has the ad-vantages of high reliability,high standardization and controlled operation time.In addition,GF-3 satellite pre-launch status configuration time is shortened by 40%.The optimization strategy and automatic tool have reference value for the pre-launch status configuration of follow-up remote sensing satellites and other type of spacecraft.

关键词

高分三号卫星/发射/状态设置/流程优化

Key words

GF-3 satellite/launch/status configuration/process optimization

分类

航空航天

引用本文复制引用

安亮,于忠江,侯锐,王华茂..高分三号卫星发射前状态设置的优化[J].航天器工程,2017,26(6):143-148,6.

基金项目

国家重大科技专项工程 ()

航天器工程

OA北大核心CSCDCSTPCD

1673-8748

访问量1
|
下载量0
段落导航相关论文