| 注册
首页|期刊导航|水力发电|溧阳抽水蓄能电站地下厂房洞室群防渗排水设计

溧阳抽水蓄能电站地下厂房洞室群防渗排水设计

胡林江 冯树荣 胡育林 郭冬云

水力发电2017,Vol.43Issue(11):39-42,90,5.
水力发电2017,Vol.43Issue(11):39-42,90,5.

溧阳抽水蓄能电站地下厂房洞室群防渗排水设计

Seepage Prevention and Drainage Design for the Underground Powerhouse of Liyang Pumped-storage Power Station

胡林江 1冯树荣 2胡育林 1郭冬云2

作者信息

  • 1. 水能资源利用关键技术湖南省重点实验室,湖南长沙410014
  • 2. 中国电建集团中南勘测设计研究院有限公司,湖南长沙410014
  • 折叠

摘要

Abstract

The geological conditions of surrounding rock in the chamber group of underground powerhouse of Liyang Pumpedstorage Power Station are unfavorable,and the groundwater is also abundant.In order to reduce the impact of groundwater on the safety of chamber group of underground powerhouse during construction and operation periods,the seepage prevention and drainage system is designed based on the idea of “drainage-based,pump drainage and gravity flow combined”.Multi-purpose principle is adopted in the design of drainage gallery.The drainage gallery is first constructed,which lays a foundation for effectively reducing groundwater level,constructing pre-stressed anchor in advance and pre-embedding monitoring equipments.

关键词

防渗排水设计/地下厂房洞室群/溧阳抽水蓄能电站

Key words

seepage prevention and drainage design/chamber group of underground powerhouse/Liyang Pumped-storage Power Station

分类

建筑与水利

引用本文复制引用

胡林江,冯树荣,胡育林,郭冬云..溧阳抽水蓄能电站地下厂房洞室群防渗排水设计[J].水力发电,2017,43(11):39-42,90,5.

基金项目

中国电建集团科技计划项目(DJ-ZDXM-2015-22) (DJ-ZDXM-2015-22)

水力发电

OA北大核心CSTPCD

0559-9342

访问量0
|
下载量0
段落导航相关论文