| 注册
首页|期刊导航|铁道标准设计|成都动车段工程设计及技术创新

成都动车段工程设计及技术创新

向航鹰

铁道标准设计2017,Vol.61Issue(11):151-154,4.
铁道标准设计2017,Vol.61Issue(11):151-154,4.DOI:10.13238/j.issn.1004-2954.2017.11.031

成都动车段工程设计及技术创新

Design and Technological Innovations of Chengdu EMU Depot

向航鹰1

作者信息

  • 1. 中铁二院工程集团有限责任公司,成都610031
  • 折叠

摘要

Abstract

EMU Depot undertakes high level repairing to ensure safe and reliable operation of EMU and extend effectively the running mileage of EMU.The engineering design of EMU depot is an important task of high-speed railway design.In the design of Chengdu EMU depot,EMU maintenance data are calculated based on the existing network planning,and the lack of maintenance capacity is identified,which lead to the proposal to enhance network maintenance capability by establishing chengdu EMU Depot.Based on the characteristics of Chengdu hub layout," two stations share one depot" is put proposed for the first time to effectively fulfill resource sharing.The general layout fully takes into account the terrain conditions and maintenance process techniques to avoid interference with municipal roads.A large number of engineering techniques are employed innovatively,such as bogie streamline repair approach of "straight streamline repair,double posts for key process" and cement mixing pile to reinforce foundation in the depot.Engineering and technological innovations for Chengdu depot improve the engineering design and accumulate EMU maintenance technical experiences to provide references for the design of other EMU depots.

关键词

动车段/设计/创新

Key words

EMU depot/Design/Innovation

分类

交通工程

引用本文复制引用

向航鹰..成都动车段工程设计及技术创新[J].铁道标准设计,2017,61(11):151-154,4.

铁道标准设计

OA北大核心

1004-2954

访问量0
|
下载量0
段落导航相关论文