铁道标准设计2017,Vol.61Issue(11):155-159,5.DOI:10.13238/j.issn.1004-2954.2017.11.032
物业开发地铁车辆段首层盖板高度影响因素分析
Influence Factors on the First Cover Plate Height of Property Development of Metro Depot
张邦力1
作者信息
- 1. 中铁第一勘察设计院集团有限公司环设处,西安710043
- 折叠
摘要
Abstract
Upper property development of metro depot is the trend of in future construction of metro depot.But at present,the cover plate height of the upper property development of all metro depots is designed differently and it is necessary to analyze and research the rationality and economy of the designed heights.In this paper,the main factors influencing the cover plate height are proposed and analyzed with reference to influencing factors involved in Zhen-long depot of Guangzhou metro line 21 in perspective of the height design and the effect on project investment.The results can be used to obtain reasonable values of the main influence factors for Zhen-long depot and work out the reasonable design height and effectively reduce construction cost.关键词
地铁车辆段/物业开发/首层盖板高度/工程投资Key words
Metro depot/Property development/First cover plate height/Project investment分类
交通工程引用本文复制引用
张邦力..物业开发地铁车辆段首层盖板高度影响因素分析[J].铁道标准设计,2017,61(11):155-159,5.