测控技术2017,Vol.36Issue(12):52-56,62,6.
电力系统中抽水蓄能机组低频切泵优化策略
Optimization Strategy of Under-Frequency Load Shedding For Pumped Storage Units in Power System
摘要
Abstract
The two strategies of urder-frequency load shedding for pumped storage units are introduced and compared.In order to maintain the stability of the power system frequency when the power system is subject to a large disturbance and a large power losses,the optimization strategy of under-frequency load shedding for pumped storage units is proposed.According to the frequency variation or the rate of change of frequency of the system,the shedding amount of the pumped storage units is determined,and the fast cutting pump unload is completed before the grid load shedding device act,so that to ensure the grid frequency in the normal operating range without taking measures to reduce the user's load.The simulation results show that the frequency recovery is faster,the lowest frequency point is relatively higher,and the under-frequency running time will be shortened when using the rate of change of frequency to determine the unloading amount of the cutting pump.关键词
频率稳定/抽水蓄能机/低频减泵/频率变化率Key words
stability of frequency/pumped storage unit/under-frequency load shedding/rate of change of frequency分类
信息技术与安全科学引用本文复制引用
宋运忠,孟景..电力系统中抽水蓄能机组低频切泵优化策略[J].测控技术,2017,36(12):52-56,62,6.基金项目
国家自然科学基金项目(61340041,61374079) (61340041,61374079)