模糊作业时间的拆卸线平衡Pareto多目标优化

汪开普 张则强 邹宾森 毛丽丽

计算机工程与应用2018,Vol.54Issue(1):256-263,8.
计算机工程与应用2018,Vol.54Issue(1):256-263,8.DOI:10.3778/j.issn.1002-8331.1606-0393

模糊作业时间的拆卸线平衡Pareto多目标优化

Pareto optimization for multi-objective disassembly line bal- ancing with fuzzy operation times

汪开普 1张则强 1邹宾森 1毛丽丽1

作者信息

  • 1. 西南交通大学机械工程学院,成都610031
  • 折叠

摘要

Abstract

In view of the complexity of the actual disassembly work, a mathematical model of the multi-objective disas-sembly line balancing problem considering fuzzy task processing time is constructed, and a Pareto based multi-objective genetic simulated annealing algorithm is proposed. An improved Metropolis criterion of simulated annealing operation is presented to make it to be applicable to multi-objective optimization problem. The crowding distance is introduced as an evaluation mechanism to filter and preserve the elite solutions, and then the elite solutions are performed the genetic oper-ation to guide the convergence to the optimal direction. Comparing the proposed algorithm with a single-objective artifi-cial bee colony algorithm based on the 25-task involved disassembly case, it identifies the validity and the superiority of the proposed algorithm. Finally, the proposed algorithm is applied to a printer disassembly instance, and it acquires 8 bal-ancing schemes and realizes the diversity of the solution results.

关键词

拆卸线平衡/模糊作业时间/多目标优化/遗传模拟退火算法/Pareto解集

Key words

disassembly line balancing/fuzzy operation times/multi-objective optimization/genetic simulated annealing algorithm/Pareto set

分类

信息技术与安全科学

引用本文复制引用

汪开普,张则强,邹宾森,毛丽丽..模糊作业时间的拆卸线平衡Pareto多目标优化[J].计算机工程与应用,2018,54(1):256-263,8.

基金项目

国家自然科学基金(No.51205328,No.51405403) (No.51205328,No.51405403)

教育部人文社会科学研究青年基金(No.12YJCZH296) (No.12YJCZH296)

四川省应用基础研究计划项目(No.2014JY0232). (No.2014JY0232)