| 注册
首页|期刊导航|港工技术|高桩码头设施常见问题及维护治理方法

高桩码头设施常见问题及维护治理方法

李赛峰

港工技术2017,Vol.54Issue(6):87-90,4.
港工技术2017,Vol.54Issue(6):87-90,4.DOI:10.16403/j.cnki.ggjs20170620

高桩码头设施常见问题及维护治理方法

Common Problems and Maintenance Methods Related to High-pile Berth and Associated Facilities

李赛峰1

作者信息

  • 1. 宁波市交通工程质量安全监督站,浙江宁波 315040
  • 折叠

摘要

Abstract

The common problems of high-pile berth and the associated facilities are summarized by analyzing the detection and assessment results of several high-pile berths in Ningbo port, which could provide references for the detection, maintenance and control of key berth structure in future. Meanwhile, the maintenance methods which guarantee normal use of the berth structure and the rehabilitation work in convenience are put forward, which is worth studying in the maintenance of similar projects.

关键词

宁波港域/高桩码头/问题/治理方法/港口工程

Key words

Ningbo port/high-pile berth structure/problems/maintenance methods/port engineering

分类

交通工程

引用本文复制引用

李赛峰..高桩码头设施常见问题及维护治理方法[J].港工技术,2017,54(6):87-90,4.

港工技术

1004-9592

访问量0
|
下载量0
段落导航相关论文