铁道标准设计2017,Vol.61Issue(12):23-28,6.DOI:10.13238/j.issn.1004-2954.2017.12.006
铁路既有线测量设计一体化技术的研发与实践
Development and Practice on Integrated Survey and Design Technology for Exiting Railway Lines
摘要
Abstract
The paper focuses on the failure of the conventional measurement method to reconstruct existing railway lines and provide theoretical center line coordinate for CPⅢ track-laying.With track-smoothness-oriented least square optimization method,with the control pile method fitting the theoretical straight line to construct existing theoretical centerline,with curve integral method based on basic design element threshold value,with the center line mileage of the survey point calculated by overlapping normal direction through model of circulation approach and with the data of designing interface obtained by interpolation of center line mileage,the existing railway line is reconstructed.A set of total station automatic collection data system for theoretical coordinates of railway center line and an integrated survey and design processing system are developed to fulfill the target to provide the theoretical centerline coordinate for existing line design.A complete set of theory methods and technology system are formed based on field measurements for office automatic design,which is verified by engineering practice and widely used.关键词
铁路既有线/测量/拟合优化法/轨道平顺性/理论坐标/一体化系统Key words
Existing railway/Measurement/Fitting optimization method/Track regularity/Theoretical coordinate/Integrated processing system分类
交通工程引用本文复制引用
陈光金,付宏平,许张柱,张先文..铁路既有线测量设计一体化技术的研发与实践[J].铁道标准设计,2017,61(12):23-28,6.基金项目
中铁第一勘察设计院集团有限公司科研课题(院科14-01) (院科14-01)