铁道标准设计2017,Vol.61Issue(12):110-114,5.DOI:10.13238/j.issn.1004-2954.2017.12.023
以邢台东站为例谈既有站综合交通枢纽规划与改造提升
Comprehensive Traffic Hub Planning and Renovation of Existing Rail Station Based on Xingtai East Railway Station
贠毅超1
作者信息
- 1. 中铁第四勘察设计院集团有限公司,武汉430063
- 折叠
摘要
Abstract
To change an existing railway station to a comprehensive traffic hub,planning and renovation are required.Taking Xingtai East Railway Station as an example,this study concludes core issues of Xingtai east railway station traffic hub based on the analysis of the general situation and the forecast of passenger flow and construction scale,and puts forward recommended research concepts.It also illustrates key points of planning and designing and summarizes work focuses in planning and renovation of the existing comprehensive traffic hub.关键词
铁路客站/既有站/综合交通枢纽/规划/改造提升Key words
Railway Passenger Station/Existing railway station/Comprehensive traffic hub/Planning/Renovation分类
交通工程引用本文复制引用
贠毅超..以邢台东站为例谈既有站综合交通枢纽规划与改造提升[J].铁道标准设计,2017,61(12):110-114,5.