工程科学学报2018,Vol.40Issue(1):108-119,12.DOI:10.13374/j.issn2095-9389.2018.01.014
飞机移动生产线物料配送与线边存储集成优化
Integrated optimization of material delivery and line-side storage problem for aircraft moving assembly line
摘要
Abstract
To solve the material supply problem of multiple parallel assembly jobs in aircraft moving assembly line, an integrated material delivery and line-side storage decision making model and corresponding algorithm were proposed. The decisions about the stor-age of line-side material were introduced on the basis of the material-batching and vehicle scheduling problems. An integrated mathe-matical model with the objective of minimizing the number of deliveries was established and a heuristic algorithm based on the immune algorithm was proposed. A joint decision of batching, delivery time and storage position for each job' s material was proposed consider-ing delivery capability, reusing and sharing of line-side space through backward-dynamic vehicle scheduling and look-ahead storage al-gorithms while seeking the advantages of the immune algorithm. The results of the numerical experiments proved the validity of the model and algorithms.关键词
飞机移动生产线/物料配送/免疫算法/反向动态小车调度Key words
aircraft moving assembly line/material delivery/immune algorithm/backward-dynamic vehicle scheduling分类
信息技术与安全科学引用本文复制引用
胡鑫铭,陆志强..飞机移动生产线物料配送与线边存储集成优化[J].工程科学学报,2018,40(1):108-119,12.基金项目
国家自然科学基金资助项目(61473211,71171130) (61473211,71171130)