| 注册
首页|期刊导航|中国电力|大型调相机惰速同期并网可靠性研究

大型调相机惰速同期并网可靠性研究

曾先锋 侯炜 陈俊

中国电力2017,Vol.50Issue(12):38-43,6.
中国电力2017,Vol.50Issue(12):38-43,6.DOI:10.11930/j.issn.1004-9649.201711231

大型调相机惰速同期并网可靠性研究

Reliability Research on Idle Speed Synchronization of Large Condenser

曾先锋 1侯炜 1陈俊1

作者信息

  • 1. 南京南瑞继保电气有限公司,江苏南京211102
  • 折叠

摘要

Abstract

The output side of the static frequency converter (SFC) which is not equipped with step-up transformer can reduce the overall cost of installing the condenser,but then the conditions of grid connection will become harsh when the rotor speed is no longer controllable.In order to improve the grid-connected reliability of synchronization,firstly the relationship is established between the inrush current,frequency difference and angular difference,secondly the existence probability of synchronous point are researched on,then some suggestions that select a small lag angle in the positive frequency difference,a small advanced angle in the negative frequency difference and so on are put forward to improve the reliability of synchronization.Based on the example,the existence probabilities and permissible frequency differences are studied that verify the proposed methods can effectively improve the reliability of synchronization.

关键词

调相机/静止变频器/惰性降速/同期/并网

Key words

condenser/static frequency converter/idle speed/synchronization/grid connection

分类

信息技术与安全科学

引用本文复制引用

曾先锋,侯炜,陈俊..大型调相机惰速同期并网可靠性研究[J].中国电力,2017,50(12):38-43,6.

基金项目

国家电网公司科技项目(上海庙—临沂±800 kV特高压项目山东临沂换流站调相工程)This work is supported by Science and Technology Project of State Grid Corporation of China. (上海庙—临沂±800 kV特高压项目山东临沂换流站调相工程)

中国电力

OA北大核心CSCDCSTPCD

1004-9649

访问量0
|
下载量0
段落导航相关论文