中国电力2017,Vol.50Issue(12):51-56,6.DOI:10.11930/j.issn.1004-9649.201610046
特高压直流工程大型调相机组启动调试及关键技术
Contents and Key Technical Problems in Start-Up and Commissioning of Large-Scale Synchronous Condenser in UHVDC Project
摘要
Abstract
300 Mvar large-scale synchronous condenser used as dynamic reactive power support in UHVDC project is the first application in DC convertor station.The requirements include good dynamic characteristics,high reliability and easy maintenance.There are no previous experience in design,manufacture,operation and maintenance for synchronous condenser at this capacity,both in China and aboard.The characteristics of large-scale synchronous condenser set are introduced first.Main contents and requirement for condenser starting and operation are also summarized.Key techniques are discussed including emergency power supply switchover,excitation system switchover,coasting synchronization,reactive power regulation and reactive load rejecting test.The discussion gives important reference for smooth operation of future large-scale synchronous condenser set in UHVDC projects.关键词
特高压直流/大型调相机/调试内容/关键问题Key words
UHVDC/large-scale synchronous condenser/commissioning content/key problems分类
信息技术与安全科学引用本文复制引用
陶骞,王庆,阮羚,蔡万里,崔一铂,凌在汛..特高压直流工程大型调相机组启动调试及关键技术[J].中国电力,2017,50(12):51-56,6.基金项目
国家电网公司科技项目(大型调相机质量管控、性能验证及运维技术研究)This work is supported by Science and Technology Project of SGCC. (大型调相机质量管控、性能验证及运维技术研究)