电网技术2018,Vol.42Issue(1):133-139,7.DOI:10.13335/j.1000-3673.pst.2017.0802
特高压直流换流站选相合闸装置现场参数整定及测试方法
On-Site Parameter Setting and Testing Method for Phase-Selection Switching-on Control Device of UHVDC Converter Station
李辉 1刘伟良 1徐浩 1郭思源 1刘海峰 1赵永生 1敖非 1李刚 1余斌1
作者信息
- 1. 国网湖南省电力公司电力科学研究院,湖南省长沙市410007
- 折叠
摘要
Abstract
Basic principle of phase-selection switching-on control device (PSCD) in UHVDC converter station is presented,and its influence on PSCD performances such as ideal switching-on time,discrete performance and asynchronous switching-on of circuit breaker is analyzed.Then PSCD setting principle is proposed.In order to solve the problem of lack of effective on-site testing measures and method for PSCD,a testing method without adding hardware costs to verify the performances is proposed by connecting the output voltage and current of protective relays in series with the PSCD,real circuit breaker and fault-wave recorder in UHVDC converter station,with corresponding PSCD secondary circuit included in the test.Field application of the method in a converter station of an actual ± 800kV UHVDC power transmission project verifies efficiency and validity of the proposed testing method.关键词
特高压直流/选相合闸/系统调试/换相失败/预击穿/交流滤波器Key words
UHVDC/phase-selection switching-on/commissioning test/commutation failure/pre-breakdown/AC-filter分类
信息技术与安全科学引用本文复制引用
李辉,刘伟良,徐浩,郭思源,刘海峰,赵永生,敖非,李刚,余斌..特高压直流换流站选相合闸装置现场参数整定及测试方法[J].电网技术,2018,42(1):133-139,7.