电力系统保护与控制2017,Vol.45Issue(18):76-81,6.DOI:10.7667/PSPC161452
计及不确定性因素的配电网网架规划方法
Distribution network planning considering the uncertainties
摘要
Abstract
In order to consider the impacts of distributed generation (DG) output and load uncertainty in distribution network planning,a fuzzy programming approach is proposed.Triangular fuzzy numbers are used to describe the uncertainty of DG.Based on credibility theory,the network planning model of distribution network is established.Moreover,a rapid spanning tree algorithm is presented to form the initial network configuration of under-planning system.Genetic algorithm (GA) is then used to adjust and optimize the initial network configuration and finally get the optimal one.The effectiveness of the proposed approach is proved through case simulation.关键词
配电网/网架规划/分布式电源/不确定性/模糊数Key words
distribution system/network planning/distributed generation (DG)/uncertainty/fuzzy引用本文复制引用
颜炯,万涛,李浩松,杨明,郑旭,瞿少成,李金,康泰峰..计及不确定性因素的配电网网架规划方法[J].电力系统保护与控制,2017,45(18):76-81,6.基金项目
This work is supported by National Natural Science Foundation of China (No.61074046 and No.F030107) and Science and Technology Project of Hubei Electric Power Company (No.52153814000D).国家自然科学基金项目(61074046,F030107) (No.61074046 and No.F030107)
国网湖北省电力公司科技项目(52153814000D) (52153814000D)