Abstract
The Middle Route of the South-to-North Water Transfer Project has been running safely and the water quality along the line was up to standard in the past two years.The total outflow from Taocha canal headwork is more than 6 billion m3.In order to optimize the real-time water regulation of the Middle Route Project,it is necessary to systematically summarize the wa-ter regulation scheme,water regulation plan,and the water regulation practices in the past two years.This paper introduces the water regulation scheme of the project,the annual transferable water volume of Danjiangkou Reservoir,the annual water regula-tion plan,as well as the water regulation practices of the project in the past two years.It analyzes the water regulation benefits, actual water transfer volume,and water transfer loss of the Middle Route Project.It also reviews the practices of and existing problems in water regulation of the Middle Route Project and proposes corresponding suggestions.关键词
南水北调中线工程/水量调度/可调水量/受水区/陶岔渠首Key words
Middle Route of South-to-North Water Transfer Project/water regulation/transferable water/water-receiving area/Taocha canal headwork分类
建筑与水利引用本文复制引用
仲志余,刘国强,吴泽宇..南水北调中线工程水量调度实践及分析[J].南水北调与水利科技,2018,16(1):95-99,143,6.