| 注册
首页|期刊导航|铁道标准设计|城市轨道交通前期规划和设计工作内容的研究

城市轨道交通前期规划和设计工作内容的研究

任星辰

铁道标准设计2018,Vol.62Issue(1):39-44,6.
铁道标准设计2018,Vol.62Issue(1):39-44,6.DOI:10.13238/j.issn.1004-2954.201703140001

城市轨道交通前期规划和设计工作内容的研究

Research on the Content of Planning and Design of Urban Rail Transit

任星辰1

作者信息

  • 1. 中铁第一勘察设计院集团有限公司,西安710043
  • 折叠

摘要

Abstract

Based on the latest laws,regulations and rules on the construction and management of urban rail transit from the State Council,relevant ministries and commissions,China Urban Rail Transit Association and other departments,this paper introduces in detail the basic conditions of urban rail transit declaration,summarizes and abstracts the preliminary planning,design content and approval procedures of urban rail transit.As a major urban transport infrastructure construction project,the preliminary planning of the urban rail transit includes urban rail transit network planning,construction planning and engineering feasibility study.After approval,the urban rail transit project enters into the design stage,which includes the overall design of the project,preliminary design and working drawing design.The intensive study on the preliminary planning and design work of the urban rail transit can be referenced for cities that will start urban rail transit projects and can effectively promote the orderly and rational development of urban rail transit projects.

关键词

城市轨道交通/前期规划设计/申报条件/工作内容/审批程序

Key words

Urban rail transit/Preliminary planning and design/Declaration conditions/Work content/Approval procedures

分类

交通工程

引用本文复制引用

任星辰..城市轨道交通前期规划和设计工作内容的研究[J].铁道标准设计,2018,62(1):39-44,6.

铁道标准设计

OA北大核心

1004-2954

访问量0
|
下载量0
段落导航相关论文