铁道标准设计2018,Vol.62Issue(1):45-51,7.DOI:10.13238/j.issn.1004-2954.201703170001
防城港港区铁路规划方案研究
Study on Railway Planning Scheme of Fangchenggang Port Area
陈刚1
作者信息
- 1. 中铁二院工程集团有限责任公司,成都610031
- 折叠
摘要
Abstract
As the existing railway transport capacity of Fangchenggang port is close to saturation,it is necessary to study the reconstruction and extension plan of the port area to meet the planned additional traffic volume of the port area.This paper puts forward two schemes with three yards and four yards respectively based on detailed analysis of the existing railway,forecast of traffic volume and development plan of the port area.The three-yard scheme is finally recommended through the comparison of advantages and disadvantages between three-yard and four-yard schemes.The scheme recommended can not only meet the demand for railway traffic volume of the port area in the future,but also provide a strong support for the development of the rail-sea intermodal transportation in the southwest railway corridor.关键词
港区铁路/规划/车场设置/方案比选Key words
Port railway/Planning/Yard setting/Scheme comparison分类
交通工程引用本文复制引用
陈刚..防城港港区铁路规划方案研究[J].铁道标准设计,2018,62(1):45-51,7.