| 注册
首页|期刊导航|铁道标准设计|阜阳北编组站扩能改造工程供配电系统设计研究

阜阳北编组站扩能改造工程供配电系统设计研究

季昉

铁道标准设计2018,Vol.62Issue(2):148-154,7.
铁道标准设计2018,Vol.62Issue(2):148-154,7.DOI:10.13238/j.issn.1004-2954.201702060006

阜阳北编组站扩能改造工程供配电系统设计研究

Research on the Design of Electric Power Supply and Distribution System in Upgraded North Fuyang Marshalling Yard

季昉1

作者信息

  • 1. 中铁上海设计院集团有限公司电化处,上海200070
  • 折叠

摘要

Abstract

The expansion and renovation of North Fuyang Marshalling Yard extends the scale of the station yards from four yards in three stages to eight yards in three stages and upgrades its down system of production equipment and living facilities.The design of electric power supply and distribution system of the project is conducted based on the investigation and analysis of the original system and the load calculation of the eight yards in three stages scale.Following the principle of " making full use of the existing facilities",a comprehensive discussion is focused on the solutions of the supply system,the first grade distribution system and the LV distribution system.The combination of the cable charging capacity compensation with the traditional capacity's reactive power compensation at low voltage side of a 35/10 kV substation and distribution station strengthens the control of the loads' power factor in marshalling yard.Based on the design processes of electric power supply and distribution in upgraded North Fuyang Marshalling Yard,flow design patterns are formed.

关键词

编组站/扩能改造工程/供配电系统设计/充电容量补偿/容性无功补偿

Key words

Marshalling yard/Expansion and renovation project/Design of electric power supply and distribution system/Charging capacity compensation/Capacity's reactive power compensation