地质与资源2017,Vol.26Issue(6):620-624,5.
不同注水开发阶段水淹层混合地层水电阻率计算方法
CALCULATION OF MIXED FORMATION WATER RESISTIVITY IN WATER FLOODED LAYER AT DIFFERENT WATERFLOOD STAGES
摘要
Abstract
The mixed formation water resistivity in water flooded layer is a required parameter in the evaluation of residual oil saturation.Due to the ion exchange between injected water and original formation water in the middle-late stages of development,parallel conductance model can not be used to calculate the mixed formation water resistivity.A more appropriate method is needed.Firstly,the calculation method of resistivity for different mixed formation water is determined,in terms of the two different conditions of non-ion exchange and complete ion exchange.Then considering the actual injection process,the calculation model of dynamic mixed formation water resistivity is confirmed,which use ion exchange rate,calculated by the rock-electric experiment data and Archie Formula,to show the change rule of mixed formation water resistivity at different stages.Finally,the saturation calculation method of mixed formation water resistivity is presented to provide programming ideas for quantitative logging-interpreted mass data processing.关键词
水淹层/混合地层水电阻率/动态变化/离子交换Key words
water flooded layer/mixed formation water resistivity/dynamic variation/ion exchange分类
天文与地球科学引用本文复制引用
朱学娟,单沙沙..不同注水开发阶段水淹层混合地层水电阻率计算方法[J].地质与资源,2017,26(6):620-624,5.基金项目
中国石油大学胜利学院校级重点科研项目(KY2015010). (KY2015010)