火力与指挥控制2018,Vol.43Issue(2):82-85,90,5.DOI:10.3969/j.issn.1002-0640.2018.02.017
一种基于Precedence-chart的装备保障能力评估方法
An Equipment Support Capability Assessment Method Based on Precedence-chart
摘要
Abstract
Missile surface equipment include launching system and fire control system.Construction of equipment support is an important part of synchronous matching missile surface equipment. Objective evaluation of the content and effect of construction is the main basis to fully master the overall situation of missile surface equipment. According to the characteristics of missile surface equipment,the main influencing factors are analyzed,and six first level evaluation index system structures of human personnel,support equipment,security facilities,security technical information and supporting equipment and facilities are setted up. Alculating the index weight value at all levels and determining the main factors of influencing construction by delphi method.关键词
装备保障/评估指标/优序图法/指标体系Key words
equipment shore-based support/evaluation index/the precedence diagram method/index system分类
军事科技引用本文复制引用
冯佳晨,韩维,王栋,邹强..一种基于Precedence-chart的装备保障能力评估方法[J].火力与指挥控制,2018,43(2):82-85,90,5.基金项目
国家社会科学基金军事学资助项目(14GJ003-153) (14GJ003-153)