| 注册
首页|期刊导航|水利水电技术|基于熵权法的万安水库汛期分期计算

基于熵权法的万安水库汛期分期计算

王家彪 廖卫红 付晓杰 张云辉

水利水电技术2018,Vol.49Issue(1):36-41,6.
水利水电技术2018,Vol.49Issue(1):36-41,6.DOI:10.13928/j.cnki.wrahe.2018.01.006

基于熵权法的万安水库汛期分期计算

Entropy weight method-based calculation on phase-division of flood season for Wan'an Reservior

王家彪 1廖卫红 2付晓杰 2张云辉3

作者信息

  • 1. 清华大学水沙科学与水利水电工程国家重点实验室,北京 100084
  • 2. 中国水利水电科学研究院流域水循环模拟与调控国家重点实验室,北京 100038
  • 3. 杭州览千信息科技有限公司,浙江杭州311200
  • 折叠

摘要

Abstract

In order to fully and objectively reflect the changing law of the rainstorm-flood season of the watershed of Wan'an Reservoir for carrying out the scientific and reasonable demonstration on the original phase-division of the reservoir,several indexes,i.e.rainstorm,flood,etc.of the watershed are necessary to be comprehensively analyzed for the study.Aiming at that large differences among the degrees of the impacts from all the indexes on the phase-division of the watershed,the entropy weight calculations are carried out on all the phase-division indexes of Wan'an Reservoir in the study with the entropy weight method that can flexibly measure the impacting effects of the indexes,and then the phase-division is made for the watershed with the information entropy value obtained from the calculation.Moreover,the result of the phase-division is compared with those from the original phase-division and the phase-division got from Fisher method.The result shows that the entropy weight method-based phasedivision is more close to the original phase-division,however,the original phase-division is suggested to be appropriately adjusted.On one hand,the objectivity and reasonability of the phase-division are ensured and more decision-making space is provided by this method,on the other hand,it is favorable to make the impacting degree analysis on all the rainstorm-flood phase-division indexes for the watershed.

关键词

汛期分期/熵权法/信息熵/万安水库

Key words

flood season phase-division/entropy weight method/information entropy/Wan'an Reservoir

分类

水利科学

引用本文复制引用

王家彪,廖卫红,付晓杰,张云辉..基于熵权法的万安水库汛期分期计算[J].水利水电技术,2018,49(1):36-41,6.

基金项目

“十三五”国家重点研发计划项目(2016YFC0402204) (2016YFC0402204)

水利水电技术

OA北大核心CSTPCD

1000-0860

访问量0
|
下载量0
段落导航相关论文